Update: Saturday Oct 31st > Motor started and running. Open pipes here. Gotta hook up side pipes and run Flowmaster mufflers out the back to switch between. Removed door panels, painted and putting sound-proof material before replacing.
96 946 sat
Update: Saturday Oct 31st > Motor started and running. Open pipes here. Gotta hook up side pipes and run Flowmaster mufflers out the back to switch between. Removed door panels, painted and putting sound-proof material before replacing.
Also met with carpet guy and picked out interior carpet.
Fields the transaction did not carry are omitted. Open the payload to see the bytes as stored.
1MDGH35msCDVjHSe6ZzfewRNoVamVbcjf7 Unverified