Sorry that I hadn't posted the progress of the gym since early this year. It is basically done. Here is some shots of the exterior. The driveway is paved but I do not have a picture yet.
What the chain says
- Block
- 657 521
- Time
- 2020-10-19T06:06:59Z
- Signer
- 1EqCem2WJHgX8jP2ZFqJREqDRVaemR9eXE
- App
- twetch
- Type
- post
- Content type
- text/plain
- Name in tx
- twetch#18425
Fields the transaction did not carry are omitted. Open the payload to see the bytes as stored.
Signed by
1EqCem2WJHgX8jP2ZFqJREqDRVaemR9eXE Verified